top of page

Hare Row Resurfacing and Ponding Resolution

Project: Hare Row Resurfacing and Ponding Resolution

Client: JB Riney

Borough: Tower Hamlets



Introduction

JB Riney approached TopoCrew to provide professional engineering services for the Hare Row project, which involved resurfacing and resolving ponding issues in the area.


Challenges and Approach

One of the main challenges was the limited timeframe for the project, with everything needed to be done during the course of a week-end. To begin, an accurate survey of the area was conducted to identify the cause of the ponding. Through careful analysis of the gradients, we developed a design that not only eliminated the ponding issues but also eliminated the need for additional gullies. A crucial consideration in the redesign was maintaining clearance between the new surface and the bottom of the overhead railway bridge. As a result, we advised the client to take a different approach than simply overlaying the old cobbles with asphalt.


Key People

  • Liam Horn (Contracts Manager - JB Riney)

  • Bradley Carrete (Supervisor - JB Riney)

  • Cosmin Mocanu (Site Engineer - TopoCrew)

  • Beniamin Matyas (Project Engineer - TopoCrew)


Results

The project was successfully completed within the specified timeframe. The scope of work was fulfilled, and the ponding issues were completely resolved. The construction conformed to a tight schedule, ensuring maximum client satisfaction.

Conclusion

By paying attention to every aspect of the construction industry, we achieved lucrative results. With the client's satisfaction and the successful completion of the project, we have established a solid foundation for future collaborations and opportunities.