North Woolwich Road Phase 1A

Project: North Woolwich Road Phase 1A

Client: FM Conway

Borough: Newham



Introduction

The North Woolwich Road Phase 1A project presented a complex set of challenges, including road resurfacing, cycle lane construction, level crossing junctions, green area with a playground, and utilities construction. The project faced initial difficulties as the design relied on a third-party topographic survey of poor quality, making the accuracy of the designed objects dependent on the quality of the survey.



Challenges and Approach

To ensure the successful execution of the project, FM Conway enlisted the expertise of TopoCrew to provide accurate setting out, well-documented as-built surveys, identify design problems arising from the poor topographic survey, and ensure the functionality of gradients to prevent any potential ponding issues. The senior engineer leading the project demonstrated exceptional value by employing a proactive and solution-based approach.



Key People

The success of the North Woolwich Road Phase 1A project can be attributed to key individuals such as the Contract Manager, Supervisor, and Council Engineers. Their collective efforts, along with the expertise of the senior engineer from TopoCrew, played a crucial role in overcoming challenges and delivering excellent results.



Conclusion

Through a joint effort and a solution-focused attitude, the team successfully addressed design errors, redesigned sections to avoid backfall issues, and proposed cost-friendly approaches to resolve various technical queries. The senior engineer's expertise and proactive involvement in the project were so valuable that they were invited to the weekly board site meetings, where their input played a significant role in finding resolutions for many level issues.


By prioritising a solution-oriented mindset and attention to detail, the project team overcame the initial obstacles posed by the poor-quality topographic survey. They demonstrated their ability to adapt, identify problems, and propose practical solutions. This case study emphasises the importance of collaborative efforts, technical expertise, and a proactive approach in overcoming challenges and delivering exceptional results in complex construction projects. The North Woolwich Road Phase 1A project serves as a testament to TopoCrew's commitment to excellence and their ability to navigate and conquer complex project requirements.